Golden record - 12/3 Elm Court

UPRN 906312884 · 1960s deck-access block · 2 bed · 3rd floor

Years of history

0

Nothing archived, nothing lost

Jobs on record

0

£6,412 lifetime spend

Photos attached

0

All geo-tagged and timestamped

Messages logged

0

With delivery and read receipts

Time to answer a query

0s

Was 14 days across four systems

Wisebound AIEnds £780/yr of repeat spend · removes £12,400 of breach exposure

Open statutory case on this property - AW-2291 · damp & mould, make-safe clock running

The history shows repeated temporary fixes for the same fault. The permanent remedy is cheaper than the next two visits and closes the case for good.

Complete property history

Written automatically as work happens - repairs, surveys, messages, certificates and every AI action

  1. 8 Aug 2026AI actionMake-safe deadline flagged at risk

    Escalated to the compliance manager 9h 24m before the statutory deadline with a reassignment option attached.

    Wisebound AI
  2. 6 Aug 2026RepairMould treatment - bedroom 2

    Affected area treated with fungicidal wash, sealed and repainted. Dehumidifier left on site for 72 hours.

    Callum Baxter£148135 min on siteMaterials: Fungicidal wash 5L, Stain block 2.5L, Emulsion 5L
    Before - bedroom 2 north wall
    Before - bedroom 2 north wall
    After - treated, sealed and repainted
    After - treated, sealed and repainted
  3. 5 Aug 2026MessageWritten findings issued to tenant

    Plain-English findings letter sent by SMS and email with the survey results and next steps. Delivered 08:02, read 08:41.

    Wisebound AI
  4. 4 Aug 2026SurveyDamp & mould survey

    Moisture readings taken in all rooms. Bedroom 2 north wall 22.4% WME against a 16% threshold. Cold bridge confirmed at the window reveal.

    Callum Baxter62 min on site
  5. 3 Aug 2026InspectionHazard reported and triaged

    Tenant reported via portal with two photos. AI triaged as Category 1 and started the statutory clocks within the same minute.

    Tenant / Wisebound AI
    Tenant-submitted photo, 3 Aug 09:12
    Tenant-submitted photo, 3 Aug 09:12
  6. 14 Jul 2026RepairBoiler - no hot water (4th visit)

    Pump housing gasket replaced, system re-pressurised to 1.2 bar and tested under load. Recurring failure mode.

    Aileen Ferguson£18684 min on siteMaterials: Pump gasket set, Inhibitor 500ml
    Standing water below appliance
    Standing water below appliance
    Corroded pump housing gasket
    Corroded pump housing gasket
    Re-pressurised and firing under load
    Re-pressurised and firing under load
  7. 2 May 2026RepairBoiler - intermittent lockout (3rd visit)

    Pressure sensor cleaned, fault code cleared. AI noted the same failure mode as February.

    Dave MacLeod£14276 min on siteMaterials: Sensor cleaning kit
  8. 19 Feb 2026RepairBoiler - pressure loss (2nd visit)

    Expansion vessel recharged. Temporary resolution only.

    Aileen Ferguson£13868 min on site
  9. 14 Feb 2026CertificateGas Safety (CP12) renewed

    Annual gas safety inspection passed. Certificate issued and copied to the tenant.

    Aileen Ferguson
The home

1964 · concrete frame, cavity wall

Address
12/3 Elm Court, EH6 5RT
Area
EH6 Leith
Tenant
Ms J. Cairns
Tenancy
Scottish secure tenancy since Mar 2016
Child under 5 in householdAsthma noted (child)
Assets in this home

Condition, age and what the history says about them

  • Worcester Bosch 28i boilerPoor

    Installed Nov 2014 · 11 yr

    4 repairs in 6 months - replacement recommended

  • Consumer unit (18th ed.)Good

    Installed Jun 2021 · 5 yr

    RCBO protected, no remedials outstanding

  • UPVC windowsFair

    Installed Mar 2011 · 15 yr

    Bedroom 2 seal degraded - cold bridge suspected

  • Bathroom extractorGood

    Installed Aug 2019 · 7 yr

    Airflow tested Feb 2026

Certificates

Statutory compliance for this home and its block

  • Gas Safety (CP12)14 Feb 2027
  • Electrical (EICR)22 Jun 2029
  • Fire Risk Assessment (block)3 Oct 2026
  • Legionella (block)19 Jan 2027
Ask this record

96,400 items indexed across 412 homes

"Show every damp report and what we did about it"
Answer

Three damp reports on this property. Two were treated with stain block and paint only; the third found the external cause. Total spend on temporary fixes £780. The permanent repair is scheduled and the statutory clock is on track.

Sourced from 7 records